#81862: "Contracts"
Hva handler denne rapporten om?
Hva har skjedd, eller hva gjelder det? Vennligst velg
Hva har skjedd, eller hva gjelder det? Vennligst velg
Vennligst sjekk om det allerede er en rapport om samme emne
Hvis ja, vennligst STEM på denne rapporten. Rapporter med flest stemmer er gitt PRIORITET!
| # | Status | Votes | Game | Type | Title | Last update |
|---|
Detaljert beskrivelse
-
• Vennligst kopier/lim inn feilmeldingen du ser på skjermen, om mulig.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Vennligst forklar hva du ønsket å gjøre, samt hva du faktisk gjorde og hva som skjedde
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Hvilken nettleser bruker du?
Google Chrome v109
-
• Vennligst kopier / lim inn teksten som vises på engelsk i stedet for språket ditt. Hvis du har et skjermbilde av denne feilen (alltid lurt) kan du bruke Imgur.com for å laste det opp og kopiere inn lenken til bildet her.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Er denne teksten tilgjengelig i translation system? Hvis ja, har den blitt oversatt i mer enn 24 timer?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Hvilken nettleser bruker du?
Google Chrome v109
-
• Vennligst forklar ditt forslag nøyaktig og konsistent slik at det er så enkelt som mulig å forstå hva du mener.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). • Hvilken nettleser bruker du?
Google Chrome v109
-
• Hva ble vist på skjermen når du ble blokkert (Tom skjerm? Del av spillgrensesnittet? Feilmelding?)
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). • Hvilken nettleser bruker du?
Google Chrome v109
-
• Hvilken del av reglene ble ikke respektert av BGA-tilpasningen
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Er regelbruddet tydelig i spilloggen? Hvis ja, Hvilket trekknummer?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Hvilken nettleser bruker du?
Google Chrome v109
-
• Hva var spillhandlingen du ønsket å gjøre?
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Hva prøvde du å gjøre for å trigge denne spillhandlingen?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). -
• Hva skjer når du prøver å gjøre dette (feilmelding, meldingsstatus for meldingsfelt, ...)?
• Hvilken nettleser bruker du?
Google Chrome v109
-
• På hvilket tidspunkt i spillet oppsto problemet (hva var den daværende spillinstruksjonen)?
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Hva skjer når du forsøker å gjøre en spillhandling (feilmelding, spillstatusfeltmelding, ...)?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Hvilken nettleser bruker du?
Google Chrome v109
-
• Vennligst beskriv visningsproblemet. Hvis du har et skjermbilde av denne feilen (alltid lurt) kan du bruke Imgur.com for å laste det opp og kopiere inn lenken til bildet her.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). • Hvilken nettleser bruker du?
Google Chrome v109
-
• Vennligst kopier / lim inn teksten som vises på engelsk i stedet for språket ditt. Hvis du har et skjermbilde av denne feilen (alltid lurt) kan du bruke Imgur.com for å laste det opp og kopiere inn lenken til bildet her.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Er denne teksten tilgjengelig i translation system? Hvis ja, har den blitt oversatt i mer enn 24 timer?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Hvilken nettleser bruker du?
Google Chrome v109
-
• Vennligst forklar ditt forslag nøyaktig og konsistent slik at det er så enkelt som mulig å forstå hva du mener.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). • Hvilken nettleser bruker du?
Google Chrome v109
Rapporthistorikk
The elevation granted by the contract was automatically build because there was only one place available.
Contract rewards are not mandatory.
The conduit granted by the contract was automatically built.
When there isn't only one place available, there is an option to skip building the structure. It should always be an option.
Legg til noe i denne rapporten
- En annen bord ID / flytt ID
- Løste F5 problemet?
- Oppstod problemet gjentatte ganger? Hver gang? Tilfeldig?
- Hvis du har et skjermbilde av denne feilen (alltid lurt) kan du bruke Imgur.com for å laste det opp og kopiere inn lenken til bildet her.